Quote:
Originally Posted by jlstyle
$20k for the scope you described is doable but very tight.
Bathroom will cost about $10k alone if plumbing is not ready.
And other materials are cheap but it's all about labor.
For rule of thumb, multiply material cost by 3 for the labor to start.
|
Plumbing for bathroom is already there, just have to hook up the toilet/sink/shower to it, don't know how much work that will be, but its above the concrete with pipes capped.